AP Transco Metering Guideline for Captive Solar Plants


AP Transco has come up with the metering guideline for captive solar plants. The meters used should be of 0.2 s class accuracy. The captive generators can sell the power through an open access third party or to group captive consumers. The cross subsidy charges will not be applicable, if the group captive consumers consume more than 51% of the total generation. Any unscheduled power injected by the solar captive power plant is considered as inadvertent power. The settlement of schedule power will be done as per the prevailing open access regulations. The meters will be installed on the HV side of the solar generator transformer in the project switchyard. The project proponents are also required to monitor auxiliary consumption and captive consumption through a tri-vector meter of .2 s accuracy class meters. Typical metering arrangement will be as follows:

Type A:

Image

 

Type B:

Image

 

Type C:

 

Image

 

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s